Each worksite must be regularly analyzed on a continuing basis in order to identify existing actual or potentially hazardous conditions. It is the responsibility of the Project Manager to administer the complete Jobsite Safety Program through the Site Superintendent and in a manner coordinated with the Safety and Health Manager.
The consideration of the Safety Program begins at the site utilization planning stage, and continues throughout the life of the project. Consider the Site Safety Planning Checklist of Section 4.3 as a starting point to help organize the particular project’s Jobsite Safety Program.
Post your comment on this topic.